Facility will include classrooms, seminar and meeting rooms, and study/lounge space for graduate students, staff offices and support spaces. The building will be located in the northern half of the Criser Hall parking lot, south of Stuzin Hall.
GSF: 53,700
Registered in 2008
Total credits attempted: 45 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
45 |
|
| Sustainable Site |
11/14 |
|
| Water Efficiency |
5/5 |
|
| Energy & Atmosphere |
5/17 |
|
| Materials & Resources |
7/13 |
|
| Indoor Environmental Quality |
13/15 |
|
| Innovation & Design |
4/5 |
|
| |
|
|
| |
Lacrosse Locker Room Facility
  
|
The project consists of two practice fields, one for soccer and one for lacrosse, one competition field fully lit for lacrosse, grandstand capacity seating for 1,000 to 1,500 with press box, restrooms & concessions stand, building to include locker rooms for two teams, and meeting rooms.
GSF: 21,975
Registered in 2008
Total credits attempted: 54 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
54 |
|
| Sustainable Site |
11/14 |
|
| Water Efficiency |
5/5 |
|
| Energy & Atmosphere |
12/17 |
|
| Materials & Resources |
6/13 |
|
| Indoor Environmental Quality |
15/15 |
|
| Innovation & Design |
5/5 |
|
| |
|
|
| |
| |
Levin College of Law Trial Center
  
|
The first floor will include an entry lobby, restrooms, a “judges’ chambers” meeting room, office space for the College’s trial and moot court teams, two deliberation rooms doubling as seminar rooms, and a courtroom. The courtroom shall include gallery seating for 108, a 14-person jury box, a judges’, a witness stand, and space for other courtroom functions such as clerk/stenographer.
The second level will consist of multi-purpose space for judges’ chambers, “clinic” space and faculty offices.
GSF: 14,956
Registered in 2008
Total credits attempted: 50 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
50 |
|
| Sustainable Site |
1214 |
|
| Water Efficiency |
5/5 |
|
| Energy & Atmosphere |
9/17 |
|
| Materials & Resources |
6/13 |
|
| Indoor Environmental Quality |
13/15 |
|
| Innovation & Design |
5/5 |
|
| |
|
|
| |
Golf Course Club House Renovation and Expansion
  
|
The proposed project includes the renovation of the existing Golf Course Club House including offices, locker rooms and athletic shop. The available open patio space will create a lounge for male and female teams. Mechanical components and the building envelope will be commissioned by an independent consultant.
GSF Expansion: 7,200
GSF Renovation: 2,400
Registered in 2008
Total credits attempted: 43 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
43 |
|
| Sustainable Site |
8/14 |
|
| Water Efficiency |
3/5 |
|
| Energy & Atmosphere |
11/17 |
|
| Materials & Resources |
6/13 |
|
| Indoor Environmental Quality |
14/15 |
|
| Innovation & Design |
1/5 |
|
| |
|
|
| |
Harn Museum - Asian Art Wing
 
|
This project is comprised of a three story addition to the west side of the Harn Museum. The future utilization of the Harn Museum was assessed and a need for an art storage space, exhibition space, offices and support spaces for the Asian art collection was identified. This is their fastest growing collection due to special support and various endowments.
GSF: 22,000
Registered in 2008
Total credits attempted: 55 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
55 |
|
| Sustainable Site |
13/14 |
|
| Water Efficiency |
5/5 |
|
| Energy & Atmosphere |
9/17 |
|
| Materials & Resources |
9/13 |
|
| Indoor Environmental Quality |
14/15 |
|
| Innovation & Design |
5/5 |
|
| |
|
|
| |
Veterinary Education and Clinical Research Center
   
|
The project aims for the expansion of the College of Veterinary Medicine Small Animal Hospital, at the University of Florida including a linear accelerator facility for small animals. The proposed project is envisioned as a 3 story addition to the Small Animal Hospital (SAH) that was opened in 1978. A minimum Silver LEED accreditation by the US Green Building Council will be mandatory for the completed facility.
GSF: 93,000
Registered in 2008
Total credits attempted: 53 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
53 |
|
| Sustainable Site |
12/14 |
|
| Water Efficiency |
5/5 |
|
| Energy & Atmosphere |
11/17 |
|
| Materials & Resources |
7/13 |
|
| Indoor Environmental Quality |
13/15 |
|
| Innovation & Design |
5/5 |
|
| |
|
|
| |
UF Research and Conference Facility at Lake Nona
   
|
Research Facility in Orlando at the Lake Nona site. This building will include Research Labs, Offices, Conference,and Support space.
GSF: 100,000
Registered in 2008
Total credits attempted: 59 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
59 |
|
| Sustainable Site |
14/14 |
|
| Water Efficiency |
5/5 |
|
| Energy & Atmosphere |
11/17 |
|
| Materials & Resources |
9/13 |
|
| Indoor Environmental Quality |
15/15 |
|
| Innovation & Design |
5/5 |
|
| |
|
|
| |
Southwest Recreational Center Expansion
    
|
The construction and renovation of this facility is to fulfill the growing demand for intramural sports, personal training, and other recreation sports uses.
GSF Expansion: 37,000
GSF Renovation: 6,600
Registered in 2008
Total credits attempted: 54 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
54 |
|
| Sustainable Site |
12/14 |
|
| Water Efficiency |
5/5 |
|
| Energy & Atmosphere |
10/17 |
|
| Materials & Resources |
9/13 |
|
| Indoor Environmental Quality |
14/15 |
|
| Innovation & Design |
4/5 |
|
| |
|
|
| |
Student Health Care Center

|
The proposed project includes the addition of an outpatient health clinic located in the Southwest portion of the main campus.
The new facility will house all current functions of the existing Student Health Care Center, including primary medical and psychological care, health promotion, pharmacy, women’s clinic, and various other ancillary services. Phase One of this project will be a complete relocation and build-out of the existing Student Health Care Center., and construction of an 18,000 – 20,000 GSF facility which will include Women’s Clinical Services, Mental Health Services, Health Promotion, and a Pharmacy.
Square Footage (Phase I): 18,000 – 20,000 SF
Total build-out of: 40,000 – 50,000 SF
Registered in 2008
Total credits attempted: 56 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
56 |
|
| Sustainable Site |
13/14 |
|
| Water Efficiency |
5/5 |
|
| Energy & Atmosphere |
12/17 |
|
| Materials & Resources |
8/13 |
|
| Indoor Environmental Quality |
13/15 |
|
| Innovation & Design |
5/5 |
|
| |
|
|
| |
East Campus Office Building
 |
The intent of this building is to allow for expansion of the East Campus so that the main campus can expand its core operations. The proposed project will be used for administrative offices
and academic research facilities (offices, laboratories and training rooms).
GSF: 80,000
Registered in 2008
Total credits attempted: 52 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| PURSUING |
52 |
|
| Sustainable Site |
14/14 |
|
| Water Efficiency |
3/5 |
|
| Energy & Atmosphere |
13/17 |
|
| Materials & Resources |
6/13 |
|
| Indoor Environmental Quality |
11/15 |
|
| Innovation & Design |
5/5 |
|
| |
|
|
| |
| Chemistry/Chemical Biology Building |
The proposed project will provide space for undergraduate teaching laboratories, classrooms, teaching support, graduate research laboratories, and offices. The building will serve as a centralized home for undergraduate chemistry instruction.
GSF: 100,000
Registered in 2008
Total credits attempted: 0 |
GREEN FACTS
| LEED-NC v. 2.2 |
|
| IN DEVELOPEMENT |
0 |
|
| Sustainable Site |
0/14 |
|
| Water Efficiency |
0/5 |
|
| Energy & Atmosphere |
0/17 |
|
| Materials & Resources |
0/13 |
|
| Indoor Environmental Quality |
0/15 |
|
| Innovation & Design |
0/5 |
|
| |
|
|
| |